Rebates: Commercial Rebates

  • 1 project per year/per meter
  • LED lights only
  • Up to 50% of fixture/lamp cost, 500 lumens or greater
  • Product must be Energy Star or DLC certified
  • $20,000 per project cap
  • You must contact MPE within 90 days of purchase
  • Invoice, number of lights/lamp, cut sheet for each light/lamp

NEW Installations

  • Level 2, non-managed chargers: 50% of total equipment and electrical service installation costs up to $250
  • Level 2, with network and fee for charge capability: 50% of EV charging equipment and electrical service installation costs up to $1,000
  • Level 3, DC fast chargers (must be publicly accessible): $3,000 - $7,500 (based on capacity of charger)

QUALIFYING INSTALLATIONS

  • Level 2 & 3 chargers only (L1 does not qualify)
  • MUST be Wi-Fi capable

CONDITIONS

  • Invoices must be provided to MPE within 90 days of purchase/installation 
  • Wiring invoices MUST include physical address of work performed
  • EVSE manufacturer and model number identification
  • Itemized receipt, including breakout of equipment and labor
  • Photo of installation including charger and electrical service
  • Based on lumen output (check with MPE before purchasing)
  • 25% of head cost
  • $20,000 per project cap